KPI
OKA’s homepage displays 6 main KPIs computed on a subset of jobs based on:
the selected cluster
the current filters used to select a specific workload of jobs
Available KPIs are:
The minimum submit date of the jobs
The maximum submit date of the jobs
The number of jobs
The number of core-hours
The cost of the workload
Average and maximum power consumed by the jobs. Power for jobs running at the same time are summed to compute the power for the whole workload.
Total energy consumption of the workload
Total carbon footprint of the workload